Carnach

Repair Project

The Carnach, slipped at Arisaig was another job completed “on location”.

The Carnach had suffered extensive damage to the cleat and surrounding deck area on the starboard side.

To begin the repair I had to firstly cut out the damaged area in order to rebuild and strengthen the deck for the new cleat to be positioned.

The damaged area was reinforced underneath with fibreglass, the visible deck area was also fibreglassed with a gel finish and the anti slip track merged with the new repair, once ready the deck area was finished, flattened and polished and the cleat was replaced in the newly strengthened position.

The Carnach is now back in the water and being used by it’s happy owners once again.